646-363-6745
New York City · Local Law 97

What will your building owe the city?

Most buildings over 25,000 square feet now report their carbon emissions to the City every year, and buildings on the annual-limit track pay $268 for every ton over their limit. Run your numbers below against the City's own limits. When you are ready to file, a New York licensed engineer prepares and certifies the report.

  • NY Professional Engineer #092566
  • NYSED Certificate of Authorization #0024417
  • No equipment sales or commissions

Next annual report due May 1

LL97 exposure worksheet

Fill in what you know. Start with your address to pull your building's public benchmarking data, or type the numbers from your Energy Star Portfolio Manager summary.

1 · Find your building

2 · Floor area by use

Use the property types from Energy Star Portfolio Manager. Gross floor area for LL97 is determined by the registered design professional who files the report, and can differ from Department of Finance records.

3 · Annual energy use (one calendar year)

Your estimate

Enter floor area and energy use, then calculate. The address lookup queries public City data services; nothing else you type leaves your browser unless you send it to us.

Estimated, metric tons CO2e per year
Line2024–20292030–2034
Building limit——
Estimated emissions——
Over the limit——
Estimated annual penalty——

This is an estimate for planning, not a filed report or an engineering opinion. It applies the limits and coefficients published in NYC Administrative Code §28-320.3 and 1 RCNY §103-14 to the numbers you enter. It applies to buildings on the Article 320 annual-limit track (Article 321 buildings follow a different path), and it does not include deductions (such as RECs or offsets), adjustments, campus or time-of-use calculations, or other fuels. Your filed report, prepared by a registered design professional, is what counts.

The law, in brief

A yearly report, a yearly limit, and a limit that drops in 2030.

May 1

Each year the owner of a covered building files a report on the prior calendar year's emissions, certified by a registered design professional: a licensed engineer or architect. Filing runs through DOB NOW for the fee and the BEAM portal for the report, using data from Energy Star Portfolio Manager. For the 2026 filings, DOB allowed a grace period through June 30.

Sources: DOB, LL97; DOB release, Apr 22, 2026

$268

Per metric ton of CO2e over the building's limit, every year. Not filing carries its own penalty of up to $0.50 per square foot of floor area for each month the report is late. For a 100,000 square foot building, that can reach $50,000 a month.

Source: DOB, LL97 violations

2030

Limits tighten in 2030. An office limit falls from 7.58 to 2.69 kilograms of CO2e per square foot; multifamily from 6.75 to 3.35. The electricity factor is cut roughly in half at the same time, which helps buildings that electrify. In the first reporting year, 29,031 buildings on 19,963 properties had to report, 16,862 of them on the annual-limit track.

Sources: 1 RCNY §103-14; DOB, LL97 first-year report

Every year

LL97 Annual Filing

Your emissions report, prepared and certified by a New York licensed PE, on the calendar every year so nobody has to remember it.

Term
1-year or 3-year agreement, per building
Fee
Flat annual fee, quoted in writing
City fees
DOB filing fee paid separately to the City ($210 simple, $615 complex report, per 1 RCNY §101-03)
  • Check that the building is on the Covered Buildings List, and on the right track
  • Review a full year of utility data in Energy Star Portfolio Manager and fix gaps before they become errors
  • Verify gross floor area and each space's property type
  • Calculate emissions against this year's limit and the 2030 limit
  • Certify the report and submit it in BEAM before May 1, with confirmation sent to you
  • Local Law 88 lighting and submetering attestation and LL84 benchmarking, handled in the same visit when they apply

Managing several buildings? One schedule and one status report cover the whole portfolio.

Before 2030

2030 Roadmap

Many buildings that pass today will not pass in 2030. The roadmap shows what yours would owe each year and what it would cost to owe nothing.

Deliverable
A written report your board, partners or lender can act on
Fee
Flat project fee, quoted in writing
  • Penalty exposure year by year, 2024 through 2034, in dollars
  • Upgrade options compared on installed cost, energy cost and penalty avoided
  • Which options your electrical service can carry, and which need a service upgrade first
  • A phased plan timed to equipment end-of-life and capital budgets
When you electrify

Electrification & Service Capacity

Heat pumps, electric hot water, induction kitchens and EV chargers all end up on the building's electrical service. Find out early whether yours can carry them.

Fee
Flat fee per phase, quoted in writing
  • Existing load and service capacity study, from utility demand data and field survey
  • Electrical design for new loads: distribution, switchgear and panel changes
  • Utility service upgrade requests and coordination with the utility
  • Standby power and transfer equipment, where life safety or operations depend on it
  • Sealed drawings for filing and construction
On call

Engineer of Record

For owners, contractors and equipment suppliers who need a New York PE on electrical work, project after project, without negotiating a new contract each time.

Structure
One master agreement, then a short task order for each project
Fee
Per task order, quoted in writing
  • Electrical design and drawings sealed for filing
  • Review of electrical drawings prepared by others, documented in writing
  • Generators, transfer switches, UPS and switchgear replacements
  • Electrical scope only; we coordinate with your architect and other engineers
Fees

How we charge

Every engagement starts with a written scope and a flat fee before work begins. City filing fees are separate and paid to the City.

Programs and how each is priced
ProgramWhat is includedTermFee
LL97 Annual FilingData review, floor area and use check, emissions calculation, PE certification and BEAM filing1 or 3 years, per buildingQuoted in writing
2030 RoadmapPenalty exposure by year, options with cost and payback, phased planOne projectQuoted in writing
Electrification & Service CapacityCapacity study, design, utility coordination, sealed drawingsPer phaseQuoted in writing
Engineer of RecordElectrical design or documented review, per projectMaster agreementQuoted in writing

Not included unless stated in the scope: site work outside New York City, other engineering disciplines, and City, utility or filing fees.

The engineer

You work with the licensed engineer who signs your report.

Justin Strafer has spent 25 years engineering the electrical equipment large buildings rely on when the grid fails: switchgear, standby generators, transfer switches, UPS systems and the controls that tie them together. That work has taken him into data centers, healthcare facilities and water and wastewater plants.

Local Law 97 is, in the end, an electrical question as much as a reporting one. The cheapest way under the 2030 limits often runs through the building's electrical service, and that is the part of the problem he knows best. He is also a named inventor on U.S. patents and holds an Executive MBA in finance, so the options you get come with costs and paybacks, not only kilowatts.

Justin M. Strafer, PE, MBA · Principal

License
Professional Engineer, New York #092566 · verify with NYSED
Firm authorization
Strafer Engineering PLLC, NYSED Certificate of Authorization #0024417
Education
BS Electrical Engineering, New Jersey Institute of Technology
Executive MBA, Finance, Rutgers Business School
Focus
Critical power, electrical service capacity, NYC building emissions compliance
Questions owners ask

Straight answers

Is my building covered?

Generally yes if it is over 25,000 gross square feet, or if two or more buildings on the same tax lot together exceed 50,000. The City's Covered Buildings List is the authority, and it also shows which track your building is on. The lookup above finds your BBL; then check it against the DOB list.

Who is allowed to sign the report?

For buildings on the annual-limit track, a registered design professional: a New York licensed Professional Engineer or Registered Architect. Strafer Engineering's reports are prepared and certified by Justin Strafer, PE.

We passed last year. Are we done?

For now. The limits drop in 2030 for most property types, so a building comfortably under today can be over in 2030 with no change in how it runs. The worksheet above shows both years side by side.

What happens if the report is late?

The City can charge up to $0.50 per square foot of floor area for each month the report is not filed. That penalty is separate from any penalty for being over the limit.

What do you need from our super or managing agent?

Access to the building in Energy Star Portfolio Manager, recent utility bills if they are not already loaded, floor plans or a recent floor area breakdown, and the owner's contact details for the DOB NOW filing fee. We send a one-page checklist.

Will electrifying help or hurt?

Usually it helps on emissions: the City's electricity factor is cut roughly in half starting in 2030. The catch is load. New heat pumps or chargers may need more electrical capacity than the building has, which is why we check the service before anyone buys equipment.

Do you sell or install equipment?

No. Strafer Engineering does not sell or install equipment and does not take commissions. We design and specify; you choose who installs.

How is the fee set?

By building and by scope, agreed in writing before work starts. The annual filing is a flat fee per building per year, with 1-year or 3-year terms. City filing fees are paid to the City and are not part of our fee.

Talk to the engineer

Send us your building.

Tell us about one building or a whole portfolio. If you ran the worksheet, your estimate comes along with your message.

We use what you send only to answer you. No mailing lists. Please do not send account numbers or other sensitive financial details.